| 61 |
IS 2418 : Part 1 (2018) |
Tubular fluorescent lamps for general lighting service: Part 1 safety requirements (Second Revision) |
- |
-
|
115200 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Clause No. 4.2 (Marking.) |
- |
900 |
|
- |
| Clause No. 4.3(Mechanical requirement for caps) |
- |
91500 |
|
a) Torsion resistance on unused lamps + 6 degree angular displacement : 1600
b) Heating treatment for 2000 hours+ 6 degree angular displacement+ Torsion after heating : 89000
c) Dimension of caps: 900 |
| Clause No. 4.4(Insulation Resistance Measurement) |
- |
1000 |
|
- |
| Clause No. 4.5(Electric strength ) |
- |
1000 |
|
- |
| Clause No. 4.6(Parts which can become accidentally live) |
- |
900 |
|
- |
| Clause No. 4.7(Resistance to heat & fire) |
- |
13300 |
|
a) Resistance to heat : 12100
b) Resistance to fire: 1200 |
| Clause No. 4.8(Creepage distance for caps) |
- |
900 |
|
- |
| Clause No. 4.9(Lamp cap temperature rise) |
- |
4800 |
|
- |
| Clause No. 4.10(Lamp minimum overall length) |
- |
900 |
|
- |
|
Complete
|
|
- |
- - |
| 62 |
IS 2418 : Part 2 (2018) |
Tubular fluorescent lamps for general lighting service: Part 2 performance requirements (Second Revision) |
- |
-
|
61500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 6 of IS 2418:2:2018(MARKING) |
- |
500 |
|
- |
| Cl 7.3 of IS 2418:2:2018(Visual Examination and Checking for Marking) |
- |
500 |
|
- |
| Cl 7.4 of IS 2418:2:2018(Burning Test) |
- |
2250 |
|
- |
| Cl 7.5 of IS 2418:2:2018(Starting Characteristics) |
- |
2250 |
|
- |
| Cl 7.6 of IS 2418:2:2018(Test for Electrical Luminous and Colour
Characteristics) |
- |
7900 |
|
- |
| Cl 7.7 of IS 2418:2:2018(Chromaticity Co-ordinates
) |
- |
7900 |
|
- |
| Cl 7.8 of IS 2418:2:2018(Life and Lumen Maintenance) |
- |
40000 |
|
1. Test charges Rs.40000/- for Life and Lumen maintenance test up to 2000 hrs.
2. Test charges Rs.30000/- for additional every 1500 hrs. beyond 2000 hrs. life and lumen maintenance. |
| Cl 6 of IS 2418:2:2018(MARKING) |
- |
500 |
|
- |
| Cl 5 of IS 2418:2:2018(MECHANCIAL, PHYSICAL AND STARTING
REQUIREMENTS) |
- |
700 |
|
- |
| Clause No. 7.4 & & 7.5(Burning Test & Starting Characteristics) |
- |
4500 |
|
- |
| 4.2 of IS 2418 : Part 1 (2018(Marking.) |
- |
900 |
|
- |
| 4.3 of IS 2418 : Part 1 (2018)(Mechanical requirement for caps) |
- |
91500 |
|
1. Test charges Rs.1600/- for torsion on unused amps + 6 deg. angular displacement.
2. Test charges Rs.89000/- for heating treatment for 2000 hrs. + 6 deg. angular displacement + torsion after heating
3. Test charges Rs.900/- for dimension of caps |
| 4.4 of IS 2418 : Part 1 (2018)(Insulation Resistance Measurement) |
- |
1000 |
|
- |
| 4.5 of IS 2418 : Part 1 (2018)(Electric strength) |
- |
1000 |
|
- |
| 4.6 of IS 2418 : Part 1 (2018)(Parts which can become accidentally live) |
- |
900 |
|
- |
| 4.7 of IS 2418 : Part 1 (2018)(Resistance to heat & fire) |
- |
13300 |
|
- |
| 4.8 of IS 2418 : Part 1 (2018)(Creepage distance for caps) |
- |
900 |
|
- |
| 4.9 of IS 2418 : Part 1 (2018)(Lamp cap temperature rise) |
- |
4800 |
|
- |
| 4.10 of IS 2418 : Part 1 (2018)(Lamp minimum overall length) |
- |
900 |
|
- |
|
Complete
|
|
- |
- - |
| 63 |
IS 6595 : Part 1 (2018) |
Horizontal centrifugal pumps for clear, cold water - Specification: Part 1 agricultural and rural water supply purposes (Fourth Revision) |
Voltage: upto 440V, Power upto 110 kW, Size: 5'' |
-
|
15985 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 8.1(Design Features
Head Restrictions) |
- |
0 |
|
- |
| 9.1(General Requirements
Volute Casing) |
- |
2530 |
|
- |
| 10(Pump Test
Verification of guarante
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
9200 |
|
- |
| Cl. 7.2(Directin of rotation) |
- |
690 |
|
- |
| Cl. 6.1(Material of Construction) |
- |
0 |
|
- |
|
Complete
|
|
- |
- - |
| 64 |
IS 8034 (2018) |
Submersible pumpsets - Specification (Third Revision) |
Voltage: up to 440V Rated power: up to110 kW, Size: 6'' |
-
|
53100 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1 (a)(Constructional Features) |
- |
3000 |
|
- |
| 6.1 (b)(Constructional Features) |
- |
3000 |
|
- |
| 6.1 (c)(Constructional Features) |
- |
3000 |
|
- |
| 6.1 (d)(Constructional Features) |
- |
3000 |
|
- |
| 6.1 (e)(Constructional Features) |
- |
3000 |
|
- |
| 6.1 (f)(Constructional Features) |
- |
3000 |
|
- |
| 6.2 (a)(Material of construction Part Sub Assembly
Shaft Sleeve) |
- |
3000 |
|
- |
| 6.2 (b)(Material of construction Part Sub Assembly
Casing wear ring
(if provided)) |
- |
3000 |
|
- |
| 6.2 (c)(Material of construction Part Sub Assembly
Bush) |
- |
3000 |
|
- |
| 6.2 (d)(Material of construction Part Sub Assembly
Discharge casing
(if provided)) |
- |
3000 |
|
- |
| 6.2 (e)(Material of construction Part Sub Assembly
Impeller) |
- |
3000 |
|
- |
| 6.2 (f)(Material of construction Part Sub Assembly
Pump Bowl/Diffuser) |
- |
3000 |
|
- |
| 6.2 (g)(Material of construction Part Sub Assembly
Pump Shaft) |
- |
3000 |
|
- |
| 6.2 (h)(Material of construction Part Sub Assembly
Suction Casing) |
- |
3000 |
|
- |
| 6.2.2.1(Gaskets, Seals and Packings) |
- |
3000 |
|
- |
| 6.2.2.2(Gaskets, Seals and Packings) |
- |
3000 |
|
- |
| 6.2.3(Gaskets, Seals and Packings) |
- |
3000 |
|
- |
| 6.2.4(Gaskets, Seals and Packings) |
- |
3000 |
|
- |
| 6.2.5(Gaskets, Seals and Packings) |
- |
3000 |
|
- |
| 7.1.1(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
| 7.1.2(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
| 7.1.3(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
| 7.1.4(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
| 7.1.5(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
| 7.1.6(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 14(Marking) |
- |
500 |
|
- |
| 8.3(Impeller) |
- |
0 |
|
- |
| 8.4.1(Shaft) |
- |
0 |
|
- |
| 8.4.2(Shaft) |
- |
800 |
|
- |
| 8.5.1(Balancing) |
- |
2700 |
|
- |
| 8.5.2(Balancing) |
- |
2700 |
|
- |
| 8.7.1(Direction of Rotation) |
- |
400 |
|
- |
| 8.7.2(Direction of Rotation) |
- |
400 |
|
- |
| 8.8(Terminal Marking) |
- |
0 |
|
- |
| 8.9.1(Typical Installation) |
- |
500 |
|
- |
| 8.9.3(Typical Installation) |
- |
500 |
|
- |
| 10.3(Hydrostatic Pressure Test) |
- |
2300 |
|
- |
| 11.1.1(Guarantee of Performance) |
- |
0 |
|
- |
| 11.1.2(Guarantee of Performance) |
- |
0 |
|
- |
| 11.1.2(Guarantee of Performance) |
- |
0 |
|
- |
| 11.1.3(Guarantee of Performance) |
- |
0 |
|
- |
| 11.1.4(Guarantee of Performance) |
- |
0 |
|
- |
| 11.1.5(Guarantee of Performance) |
- |
0 |
|
- |
| 8.6(Submersible cable) |
- |
700 |
|
- |
| 7.1.10(Voltage & Frequency variation) |
- |
0 |
|
- |
| 6(Measurement of shaft extension) |
- |
1200 |
|
- |
| 10(Pump Performance test) |
- |
12000 |
|
- |
| 11(Guarantee of Performance) |
- |
0 |
|
- |
| 9.10 (a)(Insulation Resistance test) |
- |
550 |
|
- |
| 9.10 (b)(High Voltage test) |
- |
550 |
|
- |
| 9.10 (c)(Measurement of Stator Resistance) |
- |
500 |
|
- |
| 9.10 (d)(No Load Test at Rated Voltage) |
- |
1200 |
|
- |
| 9.10 (e)(Reduced voltage Running up test) |
- |
800 |
|
- |
| 9.10 (f) & (g)(Locked Rotor Test) |
- |
3000 |
|
- |
| 9.10 (h)(Leakage current test) |
- |
1000 |
|
- |
| 9.10 (j)(Temperature Rise Test at Rated Voltage) |
- |
12000 |
|
- |
| 9.10 (k)(Temperature rise test at reduced voltage) |
- |
9000 |
|
- |
| 8.6.1(Flat/Round cables as per IS694 shall be used) |
- |
0 |
|
- |
| 8.6.2(The size of the conductor shall be adequate and suitable for contineous use under water and in air.
the length of the cable shall be minimum 2 m externallly unless otherwise specified by the customer) |
- |
0 |
|
- |
| 8.6.3(The size and of the cable should be suitably selected so that the voltage drop between control panel and the mptor terminal does not
exeed three percent of the rated voltage) |
- |
0 |
|
- |
| 8.6.4(In case a joint is required to be made between the lead cable supplied with the motor and the user’s cable, a detailed procedure to
make water tight joining shall be supplied by the motor manufacturer.) |
- |
0 |
|
- |
| 8.9.4.1(Earthing of the motor shall be done as per IS 9283 in accordance with the relevant provisions of IS 3043.) |
- |
400 |
|
- |
| 8.9.4.2(In case of PVC pipes used as discharge pipe, a separate non corrosive, low resistance conductor from motor earth terminal to control
panel earth terminal shall be provided for earthing.) |
- |
400 |
|
- |
| 8.9.4.3(In case non corrosive GI pipes and clamps are used for the purpose of earthing the motor, earthing connection may be made to
the discharge pipe clamp and to the control panel earth terminal) |
- |
400 |
|
- |
|
Complete
|
|
- |
- - |
| 65 |
IS 8144 (2018) |
Multipurpose dry batteries - Specification (Second Revision) |
R03, R6, R14 & R20 |
-
|
43835 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Designation Of Cells and Batteries, IS 8144) |
- |
0 |
|
- |
| 5(Dimensions, IS 8144) |
- |
300 |
|
- |
| 5(Dimensions, IS 8144) |
- |
0 |
|
- |
| 6.1(Terminals, IS 8144) |
- |
300 |
|
- |
| 6.2(Terminals, IS 8144) |
- |
0 |
|
- |
| 7.1(Requirements, IS 8144) |
- |
0 |
|
- |
| 7.2(Requirements, IS 8144) |
- |
0 |
|
- |
| 7.3(Requirements, IS 8144) |
- |
0 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
325 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
0 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
0 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
0 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
0 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
0 |
|
- |
| 8.1(Marking- Cl. 4.1.6, IS 6303) |
- |
0 |
|
- |
| 8.2(Marking, IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Flash light), IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Digital audio), IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Remote control), IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Motor/toy), IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Tape recorder), IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Portable lighting), IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Accelerated/ lot acceptance test), IS 8144) |
- |
0 |
|
- |
| 9.5(Delayed Life Test, IS 8144) |
- |
22850 |
|
- |
| 9.5(Delayed Life Test, IS 8144) |
- |
0 |
|
- |
| 9.6(Leakage Test, IS 8144) |
- |
1800 |
|
- |
| 9.7(Delayed life test under dry heat conditions, IS 8144) |
- |
11060 |
|
- |
| 9.7(Delayed life test under dry heat conditions, IS 8144) |
- |
0 |
|
- |
| 9.4(Initial Life Test (Radio/clock), IS 8144) |
- |
7200 |
|
- |
| 9.4(Initial Life Test (Pulse test), IS 8144) |
- |
0 |
|
- |
|
Complete
|
|
- |
- - |
| 66 |
IS 9079 (2018) |
Monoset pumps for clear, cold water for agricultural and water supply purposes - Specification (Third Revision) |
Voltage: up to 440 V Power: up to 110 kW, Size: 5” |
-
|
46346 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 10.1(GENERAL REQUIREMENTS
Casing) |
- |
1725 |
|
- |
| 10.2(GENERAL REQUIREMENTS
Impeller) |
- |
0 |
|
- |
| 10.3(GENERAL REQUIREMENTS
Shaft) |
- |
0 |
|
- |
| 9.1(DESIGN
FEATURES (Cl 9)) |
- |
0 |
|
- |
| 9.2(DESIGN
FEATURES (Cl 9)) |
- |
0 |
|
- |
| 7.1(Material of Construction) |
- |
0 |
|
- |
| 7.2(Gaskets.Seals and packings) |
- |
0 |
|
- |
| 9.1.1(The pump may be equipped with replaceable bearing and wearing ring, wherever provided.) |
- |
0 |
|
- |
| 9.1.2(The pump shall be capable to perform as per guaranteed duty point at the manometric suction lift as specified in Table 1.) |
- |
0 |
|
- |
| 9.4(The pump efficiency of monoset pumps at duty point as declared by the manufacturer for 2 and 4 poles shall not be less than given in
Fig. 3 to Fig. 6 and beyond this range, the efficiency shall be declared by manufacturer.) |
- |
0 |
|
- |
| 10.4.1, 10.4.2, 10.4.3, 10.4.4(General Requirements(Balancing)) |
- |
4600 |
|
- |
| 10.5(Provision of Earthing) |
- |
0 |
|
- |
| 10.6.2, 10.6.3(Direction of Rotation) |
- |
863 |
|
- |
| 11.8.1(a)(Measurement of stator resistance) |
- |
690 |
|
- |
| 11.8.1(b)(High Voltage test) |
- |
1380 |
|
- |
| 11.8.1(c)(Insulation Resistance test) |
- |
1380 |
|
- |
| 11.8.1(d)(No load test at rated voltage) |
- |
1380 |
|
- |
| 11.8.1(e)(Locked rotor) |
- |
3450 |
|
- |
| 11.8.1(g)(Reduced voltage running up test at no load) |
- |
863 |
|
- |
| 11.8.1(h)(Temperature rise test at rated voltage) |
- |
11500 |
|
- |
| 11.8.1(j)(Temperature rise test at reduced voltage) |
- |
9200 |
|
- |
| 13.1.3(Monoset motor shall not get overloaded in the specified operating head range at rated voltage and supply frequency.) |
- |
8625 |
|
- |
| 10.6.1(Terminal Marking) |
- |
0 |
|
- |
| 13.1(Guarantee and tolerances on Pump Performance (Cl 13)) |
- |
8625 |
|
- |
|
Complete
|
|
- |
- - |
| 67 |
IS 12615 (2018) |
Line operated three phase AC motors (IE Code) "Efficiency classes and performance specification" (Third Revision) |
Up to 110 kW 2 & 4 pole, 90 kW 6 pole, 75 kW 8 pole |
-
|
172071 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 18.3(Marking) |
- |
1000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 600
45.1 to 75 kW: Rs. 750
75.1 kW to 110 kW: Rs. 1000 |
| 16.2.1(Dimensions) |
- |
5000 |
|
Up to 5.5 kW: Rs. 715
5.5 to 11 kW: Rs. 715
11 to 22 kW: Rs. 1425
22.1 to 45 kW: Rs. 2300
45.1 to 75 kW: Rs. 3000
75.1 kW to 110 kW: Rs. 5000 |
| 16.1.2(Measurement of Resistance of Windings of Stator) |
- |
1200 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 700
45.1 to 75 kW: Rs. 900
75.1 kW to 110 kW: Rs 1200 |
| 16.1.3(No Load Test) |
- |
2000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 900
45.1 to 75 kW: Rs. 1200
75.1 kW to 110 kW: Rs. 2000 |
| 16.1.5(5 Reduced Voltage Running up Test at no-load (for squirrel cage motor up to 37 kW only)) |
- |
1500 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 700
45.1 to 75 kW: Rs. 900
75.1 kW to 110 kW: Rs 1500 |
| 16.1.4(Locked Rotor Readings of Voltage, Current and Power Input at a Suitable Reduced Voltage) |
- |
4500 |
|
Up to 5.5 kW: Rs. 600
5.5 to 11 kW: Rs. 920
11 to 22 kW: Rs. 2116
22.1 to 45 kW: Rs. 2500
45.1 to 75 kW: Rs. 3000
75.1 kW to 110 kW: Rs. 4500 |
| 16.2.3(Full Load Test to Determine Efficiency, Power Factor and Slip) |
- |
10000 |
|
Up to 5.5 kW: Rs. 1892
5.5 to 11 kW: Rs. 2386
11 to 22 kW: Rs. 4778
22.1 to 45 kW: Rs. 6000
45.1 to 75 kW: Rs. 7500
75.1 kW to 110 kW: Rs. 10000 |
| 16.2.4(Temperature Rise Test) |
- |
14000 |
|
Up to 5.5 kW: Rs. 2590
5.5 to 11 kW: Rs. 4025
11 to 22 kW: Rs. 8039
22.1 to 45 kW: Rs. 8000
45.1 to 75 kW: Rs. 11000
75.1 kW to 110 kW: Rs. 14000 |
| 16.2.5(Momentary Overload Test) |
- |
4000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 600
11 to 22 kW: Rs. 1380
22.1 to 45 kW: Rs. 2500
45.1 to 75 kW: Rs. 3000
75.1 kW to 110 kW: Rs. 4000 |
| 16.1.1(Insulation Resistance Test) |
- |
800 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 500
45.1 to 75 kW: Rs. 600
75.1 kW to 110 kW: Rs 800 |
| 16.1.6(High Voltage Test) |
- |
800 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 500
45.1 to 75 kW: Rs. 600
75.1 kW to 110 kW: Rs. 800 |
| 16.3.1( Test for Vibration Severity of Motor) |
- |
6000 |
|
Up to 5.5 kW: Rs. 1145
5.5 to 11 kW: Rs. 1145
11 to 22 kW: Rs. 2290
22.1 to 45 kW: Rs. 3500
45.1 to 75 kW: Rs. 4500
75.1 kW to 110 kW: Rs. 6000 |
| 9.0(Terminal Marking) |
- |
1000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 600
45.1 to 75 kW: Rs. 750
75.1 kW to 110 kW: Rs. 1000 |
| 8.0(Earthing) |
- |
1000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 600
45.1 to 75 kW: Rs. 750
75.1 kW to 110 kW: Rs. 1000 |
| 16.3.4(Over Speed Test) |
- |
4000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 500
22.1 to 45 kW: Rs. 2500
45.1 to 75 kW: Rs. 3000
75.1 kW to 110 kW: Rs. 4000 |
| 16.3.5( Temperature Rise Test at Limiting Values of
Voltage and Frequency Variation) |
- |
56000 |
|
Up to 5.5 kW: Rs. 10360
5.5 to 11 kW: Rs. 14000
11 to 22 kW: Rs. 27960
22.1 to 45 kW: Rs. 32000
45.1 to 75 kW: Rs. 44000
75.1 kW to 110 kW: Rs. 56000 |
| 16.3.2( Test for Noise Levels of Motor) |
- |
10000 |
|
Up to 5.5 kW: Rs. 10000
5.5 to 11 kW: Rs. 10000
11 to 22 kW: Rs. 10000
22.1 to 45 kW: Rs. 10000
45.1 to 75 kW: Rs. 10000
75.1 kW to 110 kW: Rs. 10000 |
| 16.3.3( Test for Degree of Protection by Enclosure) |
- |
38271 |
|
Up to 5.5 kW: Rs. 16012
5.5 to 11 kW: Rs. 16012
11 to 22 kW: Rs. 16012
22.1 to 45 kW: Rs. 29088
45.1 to 75 kW: Rs. 32088
75.1 kW to 110 kW: Rs. 38271 |
| 6(Method of cooling) |
- |
500 |
|
- |
| 12.2(Pull up torque) |
- |
5000 |
|
Up to 5.5 kW: Rs. 500
5.5 to 11 kW: Rs. 500
11 to 22 kW: Rs. 920
22.1 to 45 kW: Rs. 2800
45.1 to 75 kW: Rs. 3800
75.1 kW to 110 kW: Rs. 5000 |
|
Complete
|
|
- |
- - |
| 68 |
IS 13730 : Part 20 (2018) |
Specifications for particular types of winding wires: Part 20 solderable polyurethane enamelled round copper wire, class 155 (Second Revision) |
- |
-
|
- View breakup
Rs.8,31,950/-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- REVISED VERSION OF IS 13730(PT-20):2018 INCLUDED. |
| 69 |
IS 13730 : Part 31 (2018) |
Specifications for particular types of winding wires: Part 31 glass fibre wound, resin or varnish impregnated, bare or enamelled rectangular copper wire, temperature index 180 (First Revision) |
- |
-
|
- View breakup
Rs.8,28,600/-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- REVISED VERSION OF IS 13730(PT-31):2018 INCLUDED. |
| 70 |
IS 13730 : Part 32 (2018) |
Specifications for particular types of winding wires: Part 32 glass fibre wound, resin or varnish impregnated, bare or enamelled rectangular copper wire, temperature index 155 (First Revision) |
- |
-
|
- View breakup
Rs.8,28,600/-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- REVISED VERSION OF IS 13730(PT-32):2018 INCLUDED. |
| 71 |
IS 13730 : Part 33 (2018) |
Specifications for particular types of winding wires: Part 33 glass fibre wound, resin or varnish impregnated, bare or enamelled rectangular copper wire, temperature index 200 (First Revision) |
- |
-
|
- View breakup
Rs.8,28,600/-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- REVISED VERSION OF IS 13730(PT-33):20118 INCLUDED. |
| 72 |
IS 14220 (2018) |
Openwell submersible pumpsets - Specification (First Revision) |
Voltage: up to 440V Rated power: up to110 kW |
-
|
49500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 8.1(Design Features) |
- |
0 |
|
- |
| 8.1.1(Design Features) |
- |
0 |
|
- |
| 8.1.4(Design Features) |
- |
0 |
|
- |
| 8.1.5(Design Features) |
- |
0 |
|
- |
| 8.1.5(Design Features) |
- |
0 |
|
- |
| 9(Efficiency) |
- |
0 |
|
- |
| 15.5(Hydrostatic Pressure Test) |
- |
2300 |
|
- |
| 16.1.1( Guarantee of Performance) |
- |
12000 |
|
- |
| 16.1.2( Guarantee of Performance) |
- |
12000 |
|
- |
| 16.1.3( Guarantee of Performance) |
- |
12000 |
|
- |
| 16.1.4( Guarantee of Performance) |
- |
12000 |
|
- |
| 16.1.5( Guarantee of Performance) |
- |
12000 |
|
- |
| 18.1(Marking) |
- |
50 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1(Marking) |
- |
500 |
|
- |
| 18.1.3(Marking) |
- |
500 |
|
- |
| 7(Constructional features) |
- |
3000 |
|
- |
| 7.1(It is recognized that a number of materials of construction are available to meet the needs for pumps handling clear, cold water.) |
- |
3000 |
|
- |
| 7.2(Gaskets, seals and packings used for clear, cold water pumps shall conform to the applicable requirements specified in 5.2 of IS 5120.) |
- |
3000 |
|
- |
| 7.3(The motor shall be provided with a breathing attachment like bellows, diaphragm etc; to compensate the volumetric variation of
water inside the motor due to change in the temperature.) |
- |
3000 |
|
- |
| 7.4(The motor shall be protected from ingress of well water, sand and other foreign matter by means of cable glands, rubber seals etc.) |
- |
3000 |
|
- |
| 7.5(All materials and components for the motor shall be suitable for application in respect of resistance and mechanical performance
to protect it) |
- |
3000 |
|
- |
| 7.6(The rotor of the wet type open well submersible motor and rotor in water filled designed motor shall be provided with suitable coating
from corrosion under water. However if suitable anticorrosion additive is added in the water, no separate protection on
rotors is necessary.) |
- |
3000 |
|
- |
| 8(Design Features) |
- |
0 |
|
- |
| 8.1.2(The multi-stage pump shaft may be guided through bearings, the bearings may be provided in stage casing, suction housing and
discharge casing, while in case of intermediate bearings, suitable positions may be selected in the overall span.) |
- |
0 |
|
- |
| 8.1.3(The pump may be equipped with replaceable bearing and wearing ring, wherever provided.) |
- |
0 |
|
- |
| 8.1.4(The strainer on the suction shall offer the best compromise amongst restraining large solids from entering the pump and containing
the suction losses to the minimum.) |
- |
0 |
|
- |
| 8.1.5(The pump shall be capable to give discharge without overloading the prime mover within the permissible current at rated voltage
and supply frequency at minimum +5 percent and minimum –15 percent of the guaranteed duty point head up to 30 m.
Above 30 m, the pump shall be capable to give discharge without overloading the prime mover within the permissible current at rated
voltage and supply frequency at minimum +10 percent and minimum –25 percent of the guaranteed duty point head.) |
- |
0 |
|
- |
| 12(Cable) |
- |
0 |
|
- |
| 12.1(Flat/Round cables as per IS694 shall be used) |
- |
0 |
|
- |
| 12.1.2(The size of the conductor shall be adequate and suitable for contineous use under water and in air.
the length of the cable shall be minimum 2 m externallly unless otherwise specified by the customer) |
- |
0 |
|
- |
| 12.1.3(The size and of the cable should be suitably selected so that the voltage drop between control panel and the mptor terminal does
not exeed three percent of the rated voltage) |
- |
0 |
|
- |
| 12.1.4(In case a joint is required to be made between the lead cable supplied with the motor and the user’s cable, a detailed procedure to
make water tight joining shall be supplied by the motor manufacturer.) |
- |
0 |
|
- |
| 12.1.5(If four core cable is used, the fourth core is to be used for earthing.) |
- |
0 |
|
- |
| 14.10.1(a)(Insulation Resistance test) |
- |
550 |
|
- |
| 14.10.1(b)(High Voltage test) |
- |
550 |
|
- |
| 14.10.1(c)(Measurement of stator resistance) |
- |
500 |
|
- |
| 14.10.1(d)(No load test at rated voltage) |
- |
1200 |
|
- |
| 14.10.1(e)(Reduced voltage running up test at no load) |
- |
0 |
|
- |
| 14.10.1(f)(Locked rotor) |
- |
3000 |
|
- |
| 14.10.1(g)(Breakaway (starting) torque) |
- |
3000 |
|
- |
| 14.10.1(h)(Leakage current test;) |
- |
500 |
|
- |
| 14.10.1(j)(Temperature rise test at rated voltage) |
- |
12000 |
|
- |
| 14.10.1(k)(Temperature rise test at reduced voltage) |
- |
9000 |
|
- |
| 16.1(Guarntee of Performance) |
- |
12000 |
|
- |
| 16.1.1(The pumpset shall be guaranteed for their performance of the nominal volume rate of flow and the nominal head at the guaranteed
duty point. The overall efficiency of the pumpset shall be guaranteed at the declared duty point only.) |
- |
12000 |
|
- |
| 16.1.2(The guarantee shall be deemed to have been met with, if the measured values of head, volume rate of flow and overall efficiency
are within the indicated in IS 11346 limits) |
- |
12000 |
|
- |
| 16.1.3(Open well submersible motor shall not get overloaded in the specified operating head range at rated voltage and supply frequency.) |
- |
12000 |
|
- |
| 16.1.4(The pump shall be tested for the operating head range as per 8.1.5.) |
- |
12000 |
|
- |
| 16.1.5(The overloading of motor is that condition when maximum current drawn by the motor exceeds the limit of 1.07 times of the rated
motor current) |
- |
12000 |
|
- |
| 16.1.6(The tolerance shall apply to guaranteed duty point only.) |
- |
12000 |
|
- |
| 16.1.7(Performance at rated voltage and supply frequency is actual performance of the set. This is better than performance at rated speed,
since in the entire operating head range speed of motor is higher than rated speed, as motor is running in under loaded condition.) |
- |
12000 |
|
- |
| 16.1.8(The manufacturer shall specify the minimum submergence of pump unit at duty point.) |
- |
12000 |
|
- |
| 10.2(Casing) |
- |
2300 |
|
- |
| 10.3(Impeller) |
- |
3000 |
|
- |
| 10.4.1(Shaft) |
- |
3000 |
|
- |
| 10.4.2(Shaft) |
- |
800 |
|
- |
| 10.5.1(Balancing) |
- |
2700 |
|
- |
| 10.5.2(Balancing) |
- |
2700 |
|
- |
| 10.5.3(Balancing) |
- |
2700 |
|
- |
| 10.5.4(Balancing) |
- |
2700 |
|
- |
| 10.6.1( Provision for Earthing) |
- |
400 |
|
- |
| 10.6.2( Provision for Earthing) |
- |
400 |
|
- |
| 10.6.3( Provision for Earthing) |
- |
400 |
|
- |
| 10.6.4( Provision for Earthing) |
- |
400 |
|
- |
| 10.7.1(Terminal Marking and Direction of Rotation) |
- |
0 |
|
- |
| 10.7.2(Terminal Marking and Direction of Rotation) |
- |
0 |
|
- |
| 10.7.3(Terminal Marking and Direction of Rotation) |
- |
0 |
|
- |
|
Complete
|
|
- |
- - |
| 73 |
IS 16046 : Part 1 (2018) |
Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes ” Safety Requirements for Portable Sealed Secondary Cells and for Batteries Made from Them for Use in Portable Applications Part 1 Nickel Systems ( Second Revision ) |
Cells and Batteries used in portable applications, Nic |
-
|
204460 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Parameter Measurement Tolerances) |
- |
500 |
|
- |
| 5(General Safety Considerations) |
- |
1000 |
|
- |
| 5.1(General) |
- |
0 |
|
- |
| 5.2(Insulation and Wiring) |
- |
0 |
|
- |
| 5.3(Venting) |
- |
0 |
|
- |
| 5.4(Temperature, Voltage and Current Management) |
- |
0 |
|
- |
| 5.5(Terminal Contacts) |
- |
0 |
|
- |
| 5.6(Assembly of Cells into batteries) |
- |
0 |
|
- |
| 5.7(Quality Plan) |
- |
0 |
|
- |
| 6(Tyoe Test amd Sample Size) |
- |
500 |
|
- |
| 7(Specific requirements and tests) |
- |
0 |
|
- |
| 7.1(Charging procedure for test purposes) |
- |
40000 |
|
- |
| 7.2(Intended Use) |
- |
80000 |
|
For cells : Rs. 75000/-
For Batteries: Rs. 40000/- |
| 7.3(Reasonably foreseeable misuse) |
- |
84960 |
|
For cells : Rs. 84960/-
For Batteries: Rs. 51660/- |
| 8.1(General) |
- |
1000 |
|
- |
| 8.2(Small Cell and battery safety information) |
- |
0 |
|
- |
| 9(Marking) |
- |
1000 |
|
- |
| 9.1(Cell Marking) |
- |
0 |
|
- |
| 9.3(Caution for ingestion of small cells and batteries) |
- |
0 |
|
- |
| 9.4(Other information) |
- |
0 |
|
- |
| 10(Packaging) |
- |
500 |
|
- |
|
Complete
|
|
- |
- - |
| 74 |
IS 16046 : Part 2 (2018) |
Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes ” Safety Requirements for Portable Sealed Secondary Cells and for Batteries Made from Them for Use in Portable Applications Part 2 Lithium Systems ( Second Revision ) |
Cells and Batteries used in portable applications, Lith |
-
|
133500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Parameter Measurement Tolerances) |
- |
500 |
|
- |
| 5(General Safety Considerations) |
- |
1000 |
|
- |
| 5.1(General) |
- |
0 |
|
- |
| 5.2(Insulation and Wiring) |
- |
0 |
|
- |
| 5.3(Venting) |
- |
0 |
|
- |
| 5.4(Temperature, Voltage and Current Management) |
- |
0 |
|
- |
| 5.5(Terminal Contacts) |
- |
0 |
|
- |
| 5.6(Assembly of Cells into batteries) |
- |
0 |
|
- |
| 5.7(Quality Plan) |
- |
0 |
|
- |
| 5.8(Battery Safety Components) |
- |
0 |
|
- |
| 6(Tyoe Test amd Sample Size) |
- |
500 |
|
- |
| 7(Specific requirements and tests) |
- |
0 |
|
- |
| 7.1(Charging procedure for test purposes) |
- |
40000 |
|
- |
| 7.2(Intended Use) |
- |
40000 |
|
For cell : Rs. 40000/-
For Battery : 5000/- |
| 7.3(Reasonably foreseeable misuse) |
- |
82660 |
|
For cell: Rs. 49000/-
For battery: Rs. 82660/- |
| 8(Information for safety) |
- |
1000 |
|
- |
| 8.1(General) |
- |
0 |
|
- |
| 8.2(Small Cell and battery safety information) |
- |
0 |
|
- |
| 9(Marking) |
- |
1000 |
|
- |
| 9.1(Cell Marking) |
- |
0 |
|
- |
| 9.2(Battery Marking) |
- |
0 |
|
- |
| 9.3(Caution for ingestion of small cells and batteries) |
- |
0 |
|
- |
| 9.4(Other information) |
- |
0 |
|
- |
| 10(Packaging) |
- |
500 |
|
- |
|
Complete
|
|
- |
- - |
| 75 |
IS 17018 : Part 1 (2018) |
Solar photovoltaic water pumping systems: Part 1 centrifugal pumps - Specification |
UP to 10 HP |
-
|
90000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 10.3(Whole day Performance (with Sun simulator)) |
- |
90000 |
|
- |
|
Complete
|
|
- |
- - |
| 76 |
IS 8472 (2019) |
Centrifugal regenerative pumps for clear, cold water - Specification (Second Revision) |
Rated Voltage: up to 250 V Rated power: up to 10 kW, |
-
|
10845 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 16.1(Marking) |
- |
500 |
|
- |
| 12.3(Hydrostatic Pressure Test) |
- |
525 |
|
- |
| 12.4(Pump tests) |
- |
2000 |
|
- |
| 12.5(Self-Priming Test for Self-Priming Pumps) |
- |
820 |
|
- |
| 13.1.2(No Load Test at Rated Voltage) |
- |
500 |
|
- |
| 13.1.2.1.1(Temperature Rise Test at Rated Voltage) |
- |
2000 |
|
- |
| 13.1.2.1.2(Temperature Rise Test at Reduced Voltage) |
- |
2000 |
|
- |
| 13.1.2(High Voltage test) |
- |
500 |
|
- |
| 13.1.2(Insulation Resistance) |
- |
500 |
|
- |
| 8(Direction of Rotation) |
- |
500 |
|
- |
| 7(Material of Constructional) |
- |
500 |
|
- |
| 11.1(General Requirements) |
- |
0 |
|
- |
| 13.1.2(Measurement of stator resistance) |
- |
0 |
|
- |
| 13.1.2(Locked rotor test(cl.6.2(d) of IS 14582)) |
- |
500 |
|
- |
|
Complete
|
|
- |
- - |
| 77 |
IS 14494 (2019) |
Elastomer insulated flexible cables for use in mines - Specification (First Revision) |
- |
-
|
- View breakup
Type test Rs. 60,700/- + per core
Rs. 6,000/- [25% discount for BIS]
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- REVISED VERSION OF IS 14494:2019 INCLUDED. |
| 78 |
IS 6162 : Part 1 (1971) |
Specification for paper - Covered aluminium conductors: Part 1 round conductors |
- |
-
|
4000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.2(Diameter) |
- |
600 |
|
- |
| 4.3(Resistance) |
- |
800 |
|
- |
| 4.4(Tensile strength and Elongation) |
- |
800 |
|
- |
| 6.3(Arrangement of Paper layers) |
- |
600 |
|
- |
| 7(Overall diameter and increase in diameter) |
- |
1200 |
|
- |
|
Complete
|
|
- |
- - |
| 79 |
IS 6162 : Part 2 (1971) |
Specification for paper covered aluminium conductors: Part 2 rectangular conductors |
- |
-
|
2400 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 10.2 a(Conductor dimensions) |
- |
600 |
|
- |
| 10.2 b(Arrangement of Paper layers) |
- |
600 |
|
- |
| 10.2 c(Increase in dimension) |
- |
600 |
|
- |
| 10.2 d(Overall dimension) |
- |
600 |
|
- |
|
Complete
|
|
- |
- - |
| 80 |
IS 7347 (1974) |
Specification for performance of small size spark ignition engines |
Up to 110 kW |
-
|
55600 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.No.10.1(a)(Marking ) |
- |
600 |
|
- |
| Cl.No.10.1(b)(Marking ) |
- |
600 |
|
- |
| Cl.No.10.1(c)(Marking ) |
- |
600 |
|
- |
| Cl.No.9.1(h)(Reassembly ,Starting test and no load test) |
- |
600 |
|
- |
| Cl.No.9.1(g)(Strip Examination) |
- |
3600 |
|
- |
| Cl.No.9.1(f)(Rating test after endurance test) |
- |
6000 |
|
- |
| Cl.No.9.1(e)(Endurance test) |
- |
35000 |
|
- |
| Cl.No.9.1(d)(Starting test) |
- |
1450 |
|
- |
| Cl. No.9.1(c)(No load and Low speed test) |
- |
2350 |
|
- |
| Cl.No.9.1(a), Cl.No.9.3.1(Governing test) |
- |
2350 |
|
- |
| Cl.No.9.1(a)(Rating test including Fuel consumption test) |
- |
6000 |
|
- |
|
Complete
|
|
- |
- - |
| 81 |
IS 4250 (1980) |
Specification for domestic electric food - Mixers (Liquidizers And Grinders) (First Revision) |
- |
-
|
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |
| 82 |
IS 9537 : Part 1 (1980) |
Specification for conduits for electrical installations: Part 1 general requirements |
- |
-
|
- View breakup
Rs. 31,500/-; Restricted to Rs.
14,081/- for BIS Samples
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |
| 83 |
IS 1146 (1981) |
Specification for rubber and plastics containers for lead - Acid storage batteries (Second Revision) |
NA |
-
|
- View breakup
Rs.52400/-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |
| 84 |
IS 9974 : Part 1 (1981) |
Specification for high pressure sodium vapour lamps: Part 1 general requirements and tests |
- |
-
|
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1.1(MARKING) |
- |
- |
|
- |
| 4.1(Lamp Dimensions ) |
- |
- |
|
- |
| 4.3.3(Caps) |
- |
- |
|
- |
| 4.3.4(Caps : Insulation Resistance) |
- |
- |
|
- |
| 7.2.1(Lamp Starting Test : Lamp with External Starter) |
- |
- |
|
- |
| 7.3.1(Lamp Worm-Up Test) |
- |
- |
|
- |
| 10.2(Life Test) |
- |
- |
|
- |
| 4.3.1(Caps) |
- |
- |
|
- |
|
Complete
|
|
- |
- - |
| 85 |
IS 10001 (1981) |
Performance Requirements for Constant Speed Compression ignition (diesel) engines for general purposes (up to 20 kW) |
Rated power: up to 20 kW |
-
|
174000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.No.7(a)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(b)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(c)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(d)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(e)(Marking ) |
- |
1000 |
|
- |
| Cl.No.3.1(d), Cl.No.3.5.2(Governing test) |
- |
0 |
|
- |
| Cl.No.3.5.5(Lubricating Oil Consumption test) |
- |
8000 |
|
- |
| Cl.No.3.1(e)(Endurance test) |
- |
85000 |
|
- |
| Cl.No.3.1(b)(Preliminary run test) |
- |
12000 |
|
- |
| Cl.No.3.1(a)(Dimensional Measurenment for wear.) |
- |
22000 |
|
- |
|
Complete
|
|
- |
- - |
| 86 |
IS 10002 (1981) |
Specification for performance requirements for constant speed compression ignition (Diesel) engines for general purposes (Above 20 KW) |
Rated power: up to 20 kW |
-
|
174000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.No.7(a)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(b)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(c)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(d)(Marking ) |
- |
1000 |
|
- |
| Cl.No.7(e)(Marking ) |
- |
1000 |
|
- |
| Cl.No.3.1(f), (Governing test) |
- |
0 |
|
- |
| Cl.No.3.5(Lubricating Oil Consumption test) |
- |
8000 |
|
- |
| Cl.No.3.1(e)(Endurance test) |
- |
85000 |
|
- |
| Cl.No.3.1(b)(Preliminary run test) |
- |
12000 |
|
- |
| Cl.No.3.1(a)(Dimensional Measurenment for wear.) |
- |
22000 |
|
- |
|
Complete
|
|
- |
- - |
| 87 |
IS 9537 : Part 3 (1983) |
Specification for conduits for electrical installations: Part 3 rigid plain conduits of insulating meterials |
- |
-
|
- View breakup
Rs. 29,950/-; Restricted to Rs.
4,950/- sizes upto and including
25mm, Rs. 4,275/- for sizes above
25mm for BIS Samples
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |
| 88 |
IS 2465 (1984) |
Specification for cables for motor vehicles (Second Revision) |
- |
-
|
- View breakup
Rs. 54,950/- ; Multicore cables: additional charges Rs. 500/- per core per test; Restricted to Single core PVC Insulated Unsheathed: Rs. 16,545/- Single core PVC Insulated Sheathed: 75 % additional for sheath. Multi core with PVC Sheath: 75% additional for each additional core. Round and flat tinned copper braids without further covering for earthing: Rs. 1,672/- Above charges are excluding Material tests, Ageing in oxygen bomb, Capacitance test, Ozone resistance test, Effect of heat on flexibility, Effect of oils, Effect of lubricating oil, brake fluid, diesel and petrol, Effect of cooling on flexibility for BIS Samples
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |
| 89 |
IS 4289 : Part 1 (1984) |
Specification for flexible cables for lifts and other flexible connections: Part 1 elastomer insulated cables (First Revision) |
- |
-
|
- View breakup
Type tests Rs. 21,700/- ; Multicore
cables: additional charges Rs. 500/-
per core per test.
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |
| 90 |
IS 9335 : Part 3 : Sec 1 (1984) |
Specification for cellulosic papers for electrical purposes: Part 3 specifications for individual materials: Sec 1 general purpose electrical paper |
All |
-
|
- View breakup
Rs.29670/-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
- |
- - |