| 31 |
IS 13340 (1993) |
Power capacitors of self-Healing type for AC power systems having rated voltage up to 650 V - Specification |
01-10kVR,11-30kVR,31-50kVR |
-
|
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
20 Jun, 2022 |
- - |
| 32 |
IS 16103 : Part 2 (2012) |
Led modules for general lighting: Part 2 performance requirements |
- |
-
|
296000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6(Dimensions) |
- |
3000 |
|
- |
| 7(Module Power) |
- |
6000 |
|
- |
| 8(Light Output) |
- |
77000 |
|
- |
| 9(Chromaticity
Coordinates,
Correlated colour
temperature and
colour rendering) |
- |
18000 |
|
- |
| 10(LED Module Life) |
- |
150000 |
|
- |
| 13(Test for Emission
(Radiated and Conducted)
of radio frequency
distribution) |
- |
40000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 33 |
IS 16107 : Part 1 (2012) |
Luminaires performance: Part 1 general requirements |
- |
-
|
75000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 2(Photometric and Electrical Data) |
- |
75000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 34 |
IS 16107 : Part 2 : Sec 1 (2012) |
Luminaires performance: Part 2 particular requirements: Sec 1 led luminaire |
- |
-
|
263000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Total Input Power) |
- |
6000 |
|
- |
| 8(Light Output) |
- |
77000 |
|
- |
| 9(Chromaticity
Coordinates,
Correlated
colour temperature
and colour rendering) |
- |
18000 |
|
- |
| 10(LED Luminaire
Life) |
- |
160000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 35 |
IS 16077 (2013) |
Thin - Film terrestrial photovoltaic (PV) modules - Design qualification and type approval |
- |
-
|
1130000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Marking) |
- |
0 |
|
- |
| 10.1(Visual inspection) |
- |
5000 |
|
- |
| 10.2(Maximum power determination) |
- |
10000 |
|
- |
| 10.3(Insulation test) |
- |
5000 |
|
- |
| 10.4(Measurement of temperature coefficients) |
- |
20000 |
|
- |
| 10.5(Measurement of NOCT) |
- |
20000 |
|
- |
| 10.6(Performance at STC and NOCT) |
- |
20000 |
|
- |
| 10.7(Performance at low irradiance) |
- |
10000 |
|
- |
| 10.8(Outdoor exposure test) |
- |
30000 |
|
- |
| 10.9(Hot-spot endurance test) |
- |
200000 |
|
- |
| 10.10(UV preconditioning) |
- |
100000 |
|
- |
| 10.11(Thermal cycling test) |
- |
150000 |
|
- |
| 10.12(Humidity freeze test) |
- |
100000 |
|
- |
| 10.13(Damp heat test) |
- |
150000 |
|
- |
| 10.14(Robustness of termination test) |
- |
5000 |
|
- |
| 10.15(Wet leakage current test) |
- |
5000 |
|
- |
| 10.16(Mechanical load test) |
- |
20000 |
|
- |
| 10.17(Hail test) |
- |
10000 |
|
- |
| 10.18(Bypass diode thermal' test) |
- |
70000 |
|
- |
| 10.19(Light Soaking) |
- |
200000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 36 |
IS 16270 (2014) |
Secondary cells and batteries for solar photovoltaic application - General requirements and methods of test |
- |
-
|
1330000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Condition of use) |
- |
0 |
|
- |
| 5.1(Mechanical Endurance) |
- |
10000 |
|
For VRLA:10000 up to 250AH, 10000 for >250AH to 500AH, 10000 for >500AH to 5000AH, 10000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For Lead Acid Cell/Battery (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
| 5.2(Charge efficiency) |
- |
0 |
|
Testing charges already included in clause number 5.1 |
| 5.3(Deep discharge protection) |
- |
0 |
|
Testing charges already included in clause number 5.1 |
| 5.4(Marking) |
- |
0 |
|
Testing charges already included in clause number 5.1 |
| 5.5(Dafety) |
- |
0 |
|
Testing charges already included in clause number 5.1 |
| 5.6(Documentation) |
- |
0 |
|
Testing charges already included in clause number 5.1 |
| 6(Finctional Characteristics) |
- |
0 |
|
- |
| 7(General test conditions) |
- |
0 |
|
- |
| 8.1(Capacity test) |
- |
40000 |
|
For VRLA: 40000 up to 250AH, 50000 for >250AH to 500AH, 60000 for >500AH to 5000AH, 80000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For Lead Acid Cell/Battery (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
| 8.2(Endurance test) |
- |
540000 |
|
For VRLA: 540000 up to 250AH, 675000 for >250AH to 500AH, 810000 for >500AH to 5000AH, 1080000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For LA (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
| 8.3(Charge retention test) |
- |
100000 |
|
For VRLA: 100000 up to 250AH, 125000 for >250AH to 500AH, 150000 for >500AH to 5000AH, 200000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For LA (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
| 8.4(Cycle endurance in Photovoltaic application) |
- |
600000 |
|
For VRLA: 600000 up to 250AH, 750000 for >250AH to 500AH, 900000 for >500AH to 5000AH, 1200000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For LA (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
| 8.5(Sulphation Test) |
- |
30000 |
|
For VRLA: 30000 up to 250AH, 40000 for >250AH to 500AH, 45000 for >500AH to 5000AH, 60000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For LA (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
| 8.6(Water loss test) |
- |
0 |
|
- |
| 8.7(Non spillability) |
- |
10000 |
|
For VRLA: 10000 up to 250AH, 10000 for >250AH to 500AH, 10000 for >500AH to 5000AH, 10000 For >5000AH to 10000AH.
Testing charges varies according to types of batteries (i.e. For LA (Vented/ Monoblock) & For Ni-MH/ Ni-CD Cell/Battery) |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 37 |
IS 16046 (2015) |
Secondary Cells and Batteries Containing Alkaline or Other Non-acid Electrolytes - Safety Requirements for Portable Sealed Secondary Cells, and for Batteries Made from them, for Use in Portable Applications ( First Revision ) |
- |
-
|
- View breakup
Rs.Rs. 1,00,000/- for Ni Battery, Rs.
1,45,000/- for Ni Cell, Rs. 75,000/-
for Li Battery, Rs. 1,45,000/- for Li Cell
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
20 Jun, 2022 |
- - |
| 38 |
IS 16221 : Part 2 (2015) |
Safety of power converters for use in photovoltaic power systems: Part 2 particular requirements for inverters |
- |
-
|
1400000.00 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General Test Requireements) |
- |
470000.00 |
|
470000.00 for upto 20kW,
690000.00 for Above 20kW - upto 50kW,
940000.00 for Above 50kW - upto 100kW,
1290000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 5(Marking and documentation) |
- |
30000.00 |
|
30000.00 for upto 20kW,
30000.00 for Above 20kW - upto 50kW,
30000.00 for Above 50kW - upto 100kW,
30000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 6(Environmental requirements and conditions) |
- |
60000.00 |
|
60000.00 for upto 20kW,
70000.00 for Above 20kW - upto 50kW,
80000.00 for Above 50kW - upto 100kW,
100000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 7(Protection against electric shock and energy hazards) |
- |
190000.00 |
|
190000.00 for upto 20kW,
240000.00 for Above 20kW - upto 50kW,
320000.00 for Above 50kW - upto 100kW,
410000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 8(Protection against Mechanical Hazards) |
- |
100000.00 |
|
100000.00 for upto 20kW,
130000.00 for Above 20kW - upto 50kW,
170000.00 for Above 50kW - upto 100kW,
210000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 9(Protection against Fire Hazards) |
- |
120000.00 |
|
120000.00 for upto 20kW,
150000.00 for Above 20kW - upto 50kW,
190000.00 for Above 50kW - upto 100kW,
230000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 10(Protection against Sonic Pressure Hazards) |
- |
50000.00 |
|
50000.00 for upto 20kW,
50000.00 for Above 20kW - upto 50kW,
50000.00 for Above 50kW - upto 100kW,
50000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 11(Protection against Liquid Hazards) |
- |
40000.00 |
|
40000.00 for upto 20kW,
40000.00 for Above 20kW - upto 50kW,
40000.00 for Above 50kW - upto 100kW,
40000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 12(Protection against Chemical Hazards) |
- |
40000.00 |
|
40000.00 for upto 20kW,
40000.00 for Above 20kW - upto 50kW,
40000.00 for Above 50kW - upto 100kW,
40000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 13(Physical Requirements) |
- |
240000.00 |
|
240000.00 for upto 20kW,
280000.00 for Above 20kW - upto 50kW,
340000.00 for Above 50kW - upto 100kW,
400000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
| 14(Components) |
- |
60000.00 |
|
60000.00 for upto 20kW,
80000.00 for Above 20kW - upto 50kW,
100000.00 for Above 50kW - upto 100kW,
150000.00 for Above 100kW - upto 200kW.
Note: Above Testing charges are included with IS 16221 (Part 1) also. |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 39 |
IS/IEC 61730 : PART 1 (2016) |
Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction ( First Revision ) |
- |
-
|
200000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4
IS/IEC 61730-1( Classification, Application and Inteded Use) |
- |
5000 |
|
- |
| 5, 5.1
IS/IEC 61730-1( Requirements for design and Construction) |
- |
195000 |
|
Complete testing charges for Clause number 5 including all sub clauses. |
| 5.2
IS/IEC 61730-1( Marking and Documentation) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3, 5.3.1
IS/IEC 61730-1( Electrical Components and Insualtion) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.2
IS/IEC 61730-1( Internal Wiring) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.3
IS/IEC 61730-1( External Wirings and cables) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.4
IS/IEC 61730-1( Connectors) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.5
IS/IEC 61730-1( Junction Box for PV modules) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.6
IS/IEC 61730-1( Front sheet and back Sheet) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.7
IS/IEC 61730-1( Insulation Barrier) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.8
IS/IEC 61730-1( Electrical Connections) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.9
IS/IEC 61730-1( Encapsulants) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.3.10
IS/IEC 61730-1( Bypass Diodes) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4, 5.4.1
IS/IEC 61730-1( Mechanical and Electromechanical connections) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4.2
IS/IEC 61730-1( Screw Connctions) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4.3
IS/IEC 61730-1( Rivets) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4.4
IS/IEC 61730-1( Thread Cutting Screws) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4.5
IS/IEC 61730-1( Form/Press/Tight/Fit) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4.6
IS/IEC 61730-1( Connections by adhesives) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.4.7
IS/IEC 61730-1( Other Connections) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5, 5.5.1
IS/IEC 61730-1( Materials) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.2
IS/IEC 61730-1( Polymeric Materials) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.2.3.2
IS/IEC 61730-1( Endurance to Electrical Stress) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.2.3.3
IS/IEC 61730-1( Endurance to thermal stress-RTE (RTI) or TI ) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.2.3.4
IS/IEC 61730-1( Polymeric Insulating materials used as external Parts) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.2.3.5
IS/IEC 61730-1(Polymeric Insulating Parts supporting live Parts) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.2.4
IS/IEC 61730-1(Polymeric Meterial used for Mechanical functions ) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.3, 5.5.3.1
IS/IEC 61730-1(Metallic materials) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.3.2
IS/IEC 61730-1( Current Carrying Parts) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.5.4
IS/IEC 61730-1(Adhesives) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.6, 5.6.1
IS/IEC 61730-1( Protection Agianst Electric Shock) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.6.2
IS/IEC 61730-1( Protection Agianst accessibility to hazardeous live parts) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.6.3
IS/IEC 61730-1(Insulation Coordination) |
- |
0 |
|
Testing charges already covered in clause number 5. |
| 5.6.4
IS/IEC 61730-1( Distance through Insulation) |
- |
0 |
|
Testing charges already covered in clause number 5. |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 40 |
IS 302 : Part 2 : Sec 35 (2017) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 35 electric instantaneous water heaters (Second Revision) |
- |
-
|
58000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl. 6
IS 302-2-35(Classification) |
- |
0 |
|
- |
| Cl. 7
IS 302-2-35(Marking and Instruction) |
- |
1000 |
|
- |
| Cl. 8
IS 302-2-35(Protection against access to live parts) |
- |
2000 |
|
- |
| Cl. 10
IS 302-2-35(Power Input and Current ) |
- |
3000 |
|
- |
| Cl. 11
IS 302-2-35(Heating) |
- |
5000 |
|
- |
| Cl. 13
IS 302-2-35(Leakage Current & Electric Strength at Operating Temperature) |
- |
4000 |
|
- |
| Cl. 14
IS 302-2-35(Radio and television interference suppression / Transient over voltages) |
- |
2000 |
|
- |
| Cl. 15
IS 302-2-35(Moisture Resistance Test ) |
- |
5000 |
|
- |
| Cl. 16
IS 302-2-35(Leakage Current & Electric Strength at Operating Temperature (After Humidity Treatment)) |
- |
4000 |
|
- |
| Cl. 17
IS 302-2-35(Overload Protection of Transformers and Associated Circuit) |
- |
2000 |
|
- |
| Cl. 19
IS 302-2-35(Abnormal Operation ) |
- |
5000 |
|
- |
| Cl. 20
IS 302-2-35(Stability & Mechanical Hazards) |
- |
2000 |
|
- |
| Cl. 21
IS 302-2-35(Mechanical strength) |
- |
2000 |
|
- |
| Cl. 22
IS 302-2-35(Construction ) |
- |
3000 |
|
- |
| Cl. 23
IS 302-2-35(Internal Wiring) |
- |
1000 |
|
- |
| Cl. 24
IS 302-2-35(Components) |
- |
2000 |
|
- |
| Cl. 25
IS 302-2-35(Supply Connection & External Flexible Cords) |
- |
2000 |
|
- |
| Cl. 26
IS 302-2-35(Terminals for External conductors ) |
- |
1000 |
|
- |
| Cl. 27
IS 302-2-35(Provision for Earthing ) |
- |
3000 |
|
- |
| Cl. 28
IS 302-2-35(Screws & Connections) |
- |
1000 |
|
- |
| Cl. 29
IS 302-2-35(Clearances, Creepage Distances & Solid insulation ) |
- |
2000 |
|
- |
| Cl. 30
IS 302-2-35(Resistance to Heat Fire & Tracking ) |
- |
4000 |
|
- |
| Cl. 31
IS 302-2-35(Resistance to Rusting) |
- |
1000 |
|
- |
| Cl. 32
IS 302-2-35(Radiation, Toxicity and similar hazards) |
- |
1000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 41 |
IS 302 : Part 2 : Sec 80 (2017) |
Household and similar electrical appliances - Safety: Part 2 - 80 particular requirements for fans (First Revision) |
- |
-
|
60000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.0(Marking and Instructions) |
- |
0 |
|
- |
| 8.0(Protection against access to live parts) |
- |
2000 |
|
- |
| 7.0(Classification) |
- |
1000 |
|
- |
| 10.0(Input and Current) |
- |
3000 |
|
- |
| 11.0(Heating) |
- |
3000 |
|
- |
| 13.0(Leakage Current and electric strength at operating temperature) |
- |
3000 |
|
- |
| 14.0(Transient Overvoltage) |
- |
2000 |
|
- |
| 15.0(Moisture resistance) |
- |
5000 |
|
- |
| 16.0(Leakage current and Electric strength (After Humidity (Environmental) Treatment)) |
- |
2000 |
|
- |
| 17.0(Overload Protection of transformer and associated circuit) |
- |
2000 |
|
- |
| 19.0(Abnormal Operation) |
- |
5000 |
|
Excluding the testing charges of EMI/EMC (Cl. 19.11.4.1 to 19.11.4.7 of IS 302-1:2008 |
| 20.0(Stability and mechanical hazards) |
- |
2000 |
|
- |
| 21.0(Mechanical Strength) |
- |
3000 |
|
- |
| 22.0(Construction) |
- |
5000 |
|
- |
| 23.0(Internal Wiring) |
- |
2000 |
|
- |
| 24.0(Components) |
- |
5000 |
|
Additional testing charges will be applicable for other components testing, if required. Excluding the testing charges of components |
| 25.0(Supply Connection and External Flexible Cords) |
- |
3000 |
|
- |
| 26.0(Terminals for external conductors) |
- |
1000 |
|
- |
| 27.0(Provision For Earthing) |
- |
2000 |
|
- |
| 28.0(Screws and Connections) |
- |
1000 |
|
- |
| 29.0(Creepage Distances and Clearances) |
- |
2000 |
|
- |
| 30.0(Resistance To Heat and Fire) |
- |
3000 |
|
- |
| 31.0(Resistance To Rusting) |
- |
3000 |
|
- |
| 32.0(Radiation, Toxicity and Similar Hazards) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 42 |
IS 2082 (2018) |
Stationary storage type electric water heaters - Specification (Fifth Revision) |
upto 3kW & above 3kW to 5kW |
-
|
57000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| (Cl.15 of IS 2082:2018)(Verification of the Rated Capacity) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.16 of IS 2082:2018)(Standing Loss per 24 Hours) |
- |
4000 |
|
4000 for Upto 3kW & 5000 for Upto 5kW |
| (Cl.17 of IS 2082:2018)(Hot Water Output) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| Cl.18 of IS 2082:2018( Reheating Time) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.19 of IS 2082:2018)(Mixing Factor) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.20 of IS 2082:2018)(Deviation of Dial Calibration) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.21 of IS 2082:2018)(Cyclic Temperature Variation) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| Cl.22 of IS 2082:2018(Finish) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| 7(Marking) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| 6(Classification ) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.8 of IS 302-2-21:2011)(Protection Against Access to Live Parts) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.10 of IS 302-2-21: 2011)(Power Input & Current) |
- |
2000 |
|
2000 for Upto 3kW & 3000 for Upto 5kW |
| (Cl.11 of 302-2-21:2011)(Heating) |
- |
3000 |
|
3000 for Upto 3kW & 4000 for Upto 5kW |
| (Cl.13 of IS 302-2-21:2011)(Leakage Current ) |
- |
3000 |
|
3000 for Upto 3kW & 3000 for Upto 5kW |
| (Cl.13 of IS 302-2-21:2011)(Electrical Strength at Operating Temperature) |
- |
3000 |
|
3000 for Upto 3kW & 3000 for Upto 5kW |
| (Cl.14ofIS302-2-21:2011)(Transient Over Voltages) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.15 of IS 302-2-21-2011)(Moisture Resistance) |
- |
4000 |
|
4000 for Upto 3kW & 4000 for Upto 5kW |
| (Cl.17 of IS 302-2-21:2011)(Overload protection of transformers & associated circuits) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.19 of IS 302-2-21:2011)(Abnormal Operation) |
- |
3000 |
|
3000 for Upto 3kW & 4000 for Upto 5kW |
| (Cl.20 of IS 302-2-21:2011)(Stability & Mechanical Hazards) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.21ofIS302-2-21:2011)(Mechanical strength) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.22 Of
IS 302-2-21:2011)(Construction) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl. 23 of IS 302-2-21: 2011)(Internal Wiring
) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.24ofIS302-221:2011)(Component) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.25 of IS 302-2-21:2011)(Supply Connection & External Flexible Cords) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.26 of IS 302-2-21: 2011)(Terminals for External Conductors) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.27 of IS 302-2-21:2011)(Provision for Earthing) |
- |
2000 |
|
2000 for Upto 3kW & 2000 for Upto 5kW |
| (Cl.28 of IS 302-2-21:2011)(Screws & Connections) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.29ofIS302-2-21:2011)(Clearances, Creepage Distances and Solid Insulation) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| (Cl.30 of IS 302-2-21:2011)(Resistance to Heat & Fire) |
- |
3000 |
|
3000 for Upto 3kW & 3000 for Upto 5kW |
| Cl.31 of IS 302-2-21:2018(Resistance to Rusting) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| Cl.30.1 of IS 302-1:2008(Resistance to Heat & Fire : Ball pressure test ) |
- |
999.99 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
| Cl.30.2 of IS 302-1:2008(Resistance to Heat & Fire : Glow wire test ) |
- |
1000 |
|
1000 for Upto 3kW & 1000 for Upto 5kW |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 43 |
IS 2418 : Part 1 (2018) |
Tubular fluorescent lamps for general lighting service: Part 1 safety requirements (Second Revision) |
- |
-
|
105000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Clause No. 4.10(Lamp minimum overall length) |
- |
3000 |
|
- |
| Clause No. 4.9(Lamp cap temperature rise) |
- |
5000 |
|
- |
| Clause No. 4.8(Creepage distance for caps) |
- |
3000 |
|
- |
| Clause No. 4.7(Resistance to heat & fire) |
- |
20000 |
|
- |
| Clause No. 4.6(Parts which can become accidentally live) |
- |
2000 |
|
- |
| Clause No. 4.5(Electric strength ) |
- |
3000 |
|
- |
| Clause No. 4.4(Insulation Resistance Measurement) |
- |
2000 |
|
- |
| Clause No. 4.3(Mechanical requirement for caps) |
- |
65000 |
|
- |
| Clause No. 4.2 (Marking.) |
- |
2000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 44 |
IS 10617 (2018) |
Hermetic compressors - Specification (Second Revision) |
- |
-
|
975000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1.1 & 5.1 -Table 2, 3, 4,5(Compressor Performance Test & Compressor Capacity Rating Test) |
- |
400000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 45 |
IS 16046 : Part 1 (2018) |
Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes ” Safety Requirements for Portable Sealed Secondary Cells and for Batteries Made from Them for Use in Portable Applications Part 1 Nickel Systems ( Second Revision ) |
- |
-
|
103000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.2(Insulation and Wiring) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
| 5.3(Venting) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
| 5.4(Temperature, Voltage and Current Management) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
| 5.5(Terminal Contacts) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
| 5.6(Assembly of Cells into batteries) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
| 5.7(Quality Plan) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
| 6(Tyoe Test amd Sample Size) |
- |
0 |
|
- |
| 7(Specific requirements and tests) |
- |
90000 |
|
90000 for Battery,
137000 for Cells.
Total testing Charges for clause 7. |
| 7.1(Charging procedure for test purposes) |
- |
0 |
|
90000 for Battery,
137000 for Cells.
Testing Charges already included in clause 7. |
| 7.2(Intended Use) |
- |
0 |
|
90000 for Battery,
137000 for Cells.
Testing Charges already included in clause 7. |
| 7.3(Reasonably foreseeable misuse) |
- |
0 |
|
90000 for Battery,
137000 for Cells.
Testing Charges already included in clause 7. |
| 8(Information for safety) |
- |
6000 |
|
6000 for Battery,
6000 for Cells.
Testing Charges for clause 8. |
| 8.1(General) |
- |
0 |
|
6000 for Battery,
6000 for Cells.
Testing Charges already included in clause 8. |
| 8.2(Small Cell and battery safety information) |
- |
0 |
|
6000 for Battery,
6000 for Cells.
Testing Charges already included in clause 8. |
| 9(Marking) |
- |
1000 |
|
1000 for Battery,
1000 for Cells.
Testing Charges of clause 9. |
| 9.1(Cell Marking) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing Charges already included in clause 9. |
| 9.2(Battery Marking) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing Charges already included in clause 9. |
| 9.3(Caution for ingestion of small cells and batteries) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing Charges already included in clause 9. |
| 9.4(Other information) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing Charges already included in clause 9. |
| 10(Packaging) |
- |
1000 |
|
1000 for Battery,
1000 for Cells. |
| 4(Parameter Measurement Tolerances) |
- |
0 |
|
- |
| 5(General Safety Considerations) |
- |
5000 |
|
5000 for Battery,
3000 for Cells.
Testing Charges of clause 5. |
| 5.1(General) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing Charges already included in clause 5. |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 46 |
IS 16046 : Part 2 (2018) |
Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes ” Safety Requirements for Portable Sealed Secondary Cells and for Batteries Made from Them for Use in Portable Applications Part 2 Lithium Systems ( Second Revision ) |
- |
-
|
123000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Parameter Measurement Tolerances) |
- |
0 |
|
- |
| 5(General Safety Considerations) |
- |
5000 |
|
5000 for Battery,
3000 for Cells. |
| 5.1(General) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.2(Insulation and Wiring) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.3(Venting) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.4(Temperature, Voltage and Current Management) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.5(Terminal Contacts) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.6(Assembly of Cells into batteries) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.7(Quality Plan) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 5.8(Battery Safety Components) |
- |
0 |
|
5000 for Battery,
3000 for Cells.
Testing charges already included in clause 5. |
| 6(Tyoe Test amd Sample Size) |
- |
0 |
|
- |
| 7(Specific requirements and tests) |
- |
110000 |
|
110000 for Battery,
120000 for Cells. |
| 7.1(Charging procedure for test purposes) |
- |
0 |
|
110000 for Battery,
120000 for Cells.
Testing charges already included in clause 7. |
| 7.2(Intended Use) |
- |
0 |
|
110000 for Battery,
120000 for Cells.
Testing charges already included in clause 7. |
| 7.3(Reasonably foreseeable misuse) |
- |
0 |
|
110000 for Battery,
120000 for Cells.
Testing charges already included in clause 7. |
| 8(Information for safety) |
- |
6000 |
|
6000 for Battery,
6000 for Cells. |
| 8.1(General) |
- |
0 |
|
6000 for Battery,
6000 for Cells.
Testing charges already included in clause 8. |
| 8.2(Small Cell and battery safety information) |
- |
0 |
|
6000 for Battery,
6000 for Cells.
Testing charges already included in clause 8. |
| 9(Marking) |
- |
1000 |
|
1000 for Battery,
1000 for Cells. |
| 9.1(Cell Marking) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing charges already included in clause 9. |
| 9.2(Battery Marking) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing charges already included in clause 9. |
| 9.3(Caution for ingestion of small cells and batteries) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing charges already included in clause 9. |
| 9.4(Other information) |
- |
0 |
|
1000 for Battery,
1000 for Cells.
Testing charges already included in clause 9. |
| 10(Packaging) |
- |
1000 |
|
1000 for Battery,
1000 for Cells. |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 47 |
IS 369 (2019) |
Household electric direct - Acting room heaters - Performance requirements (Fourth Revision) |
- |
-
|
65000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.7 of IS 369:2019(Dimensions) |
- |
5000 |
|
- |
| Cl.8 of IS 369:2019(Temperature rises of air-outlet grilles and external surfaces) |
- |
5000 |
|
- |
| Cl.9 of IS 369:2019(Temperature rises of surfaces surrounding the heater) |
- |
5000 |
|
- |
| Cl.10 of IS 369:2019(Warming-up time of the heater) |
- |
5000 |
|
- |
| Cl.11 of IS 369:2019(Stability of room temperature) |
- |
10000 |
|
- |
| Cl.12 of IS 369:2019(Set-back) |
- |
10000 |
|
- |
| Cl.14 of IS 369:2019(Inrush current) |
- |
5000 |
|
- |
| Cl.15 of IS 369:2019(Effect of radiant heat) |
- |
10000 |
|
- |
| Cl.16 of IS 369:2019(Usable power) |
- |
5000 |
|
- |
| Cl.13 of IS 369:2019(Frost protection temperature) |
- |
5000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 48 |
IS 374 (2019) |
Specification for electric ceiling type fans and regulators (Third Revision) |
- |
-
|
41000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.2(Rating) |
- |
1000 |
|
- |
| 8.1(Marking (as per Cl. 7 of IS 302-2-80:2017)) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,a(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,b(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,c(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,d(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,e(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,f(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.1,g(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.2(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.3,a(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.3,b(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.3,c(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.3,d(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.3,e(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8.4(Marking ) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8(Marking (as per Cl. 7.1 of IS 302-2-80:2017)) |
- |
1000 |
|
- |
| 8(Marking (as per Cl. 7 of IS 302-2-80:2017, Cl.7.1 (f) of IS 302-1:2008)) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8(Marking (as per Cl. 7 of IS 302-2-80:2017, Cl.7.1(g) of IS 302-1:2008)) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 8(Marking (as per Cl.7.12.1(a) of IS 302-2-80:2017)) |
- |
0 |
|
Testing charges already included in clause number 8. |
| 9(Protection against access to live parts (as per Cl.8 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Power Input & current (as per Cl.10 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9( Heating (as per Cl.11 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Leakage current and Electric strength at operating temperature (as per Cl.13 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Leakage current and Electric strength at operating temperature (as per Cl.13 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Transient over Voltage (as per Cl.14 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Moisture Resistance (After Humidity test) (as per Cl.15 & Cl.16 of IS 302-2-80 :2017) ) |
- |
0 |
|
- |
| 9(Overload protection of transformers and associated circuits (as per Cl.17 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9( Abnormal Operation (as per Cl.19 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Staibilty and mechanical hazards (as per Cl.20.102, Table 101 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Mechanical strength (as per Cl.21 of IS 302-2-80 :2017 and Cl.21.1 of IS 302-2:2008)) |
- |
0 |
|
- |
| 9(Mechanical strength (as per Cl.21 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Mechanical strength (as per Cl.21.102 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Construction (as per Cl.22.101 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Internal wiring (as per Cl.23 of IS 302-2-80 :2017 and Cl.23 of IS 302-1:2008)) |
- |
0 |
|
- |
| 9(Components (as per Cl.24.103 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Components (as per Cl.24.104 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Supply Connection and External Flexible cords (as per Cl.25 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Terminals for External conductors (as per Cl.26 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Provision for earthing (as per Cl.27 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Screw and connections (as per Cl.28 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Clearances, creepage distances and solid insulation (as per Cl.29 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Resistance to fire (Glow wire Test) (as per Cl.30 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Resistance to rusting (as per Cl.31 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 9(Radiation, Toxicity and similar Hazards (Cl.32 of IS 302-2-80 :2017)) |
- |
0 |
|
- |
| 10.1(Speed Regulators) |
- |
3000 |
|
- |
| 10.2(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 10.3(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 10.4(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 10.5(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 10.6(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 10.7(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 10.8(Speed Regulators) |
- |
0 |
|
Testing charges already included in clause number 10.1 |
| 11.1(Starting) |
- |
1000 |
|
- |
| 11.2(Starting) |
- |
0 |
|
Testing charges already included in clause number 11.1 |
| 12(Interchangeability) |
- |
1000 |
|
- |
| 13(Silent Operation) |
- |
1000 |
|
- |
| 14.3 & Table 1(Test for Air Performance) |
- |
0 |
|
- |
| 14.4(Measurement of Speed of the Fan ) |
- |
2000 |
|
- |
| 14.5(Measurement of Power factor and Power Input) |
- |
3000 |
|
- |
| 16(Endurance Test) |
- |
10000 |
|
- |
| 17(Test for Harmonic Distortion) |
- |
8000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 49 |
IS 3315 (2019) |
Evaporative air coolers (Desert Coolers?) - Specification (Third Revision) |
- |
-
|
80000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6(PERFORMANCE REQUIREMENTS) |
- |
40000 |
|
Charges for Cl. 6.1& 9.3- Rs.10000, For Cl. 6.2(c),8.2.8 &8.4.3-Rs.10000, For Cl. 6.2(a),(b)& 10.4- Rs.20000 |
| 8.2.8, 8.4.3,&
6.2©(Power Consumption Test) |
- |
10000 |
|
Charges are for Cl. 6.2(c),8.2.8,8.4.3 |
| 8.3.1 ,8.4.2, &
6.2(Cooling Efficiency and Air Delivery Test) |
- |
10000 |
|
Charges are for 6.2 (a),(b) & 10.4 |
| 8.2.2(Protection against Electric Shock
) |
- |
5000 |
|
- |
| 8.2.3 (High Voltage Tests) |
- |
5000 |
|
- |
| 8.2.4(Insulation Resistance Test) |
- |
5000 |
|
- |
| 8.2.5( Leakage Current) |
- |
5000 |
|
- |
| 8.2.6( Earthing Connections Tests) |
- |
5000 |
|
- |
| 9.5( Energy Consumption) |
- |
10000 |
|
- |
| 15( MARKING AND
INFORMATION) |
- |
5000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 50 |
IS 11037 (2019) |
Electronic Type Fan Regulators — Specification ( First Revision ) |
- |
-
|
72000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1(Design and General Construction) |
- |
5000 |
|
- |
| 6.2(Design and General Construction) |
- |
0 |
|
Testing charges already included in 6.1 |
| 6.3(Design and General Construction) |
- |
0 |
|
Testing charges already included in 6.1 |
| 6.5(Design and General Construction) |
- |
0 |
|
Testing charges already included in 6.1 |
| 6.6(Design and General Construction) |
- |
0 |
|
Testing charges already included in 6.1 |
| 7.4.1(a)(Mechanical strength ) |
- |
2000 |
|
- |
| 7.4.1(b)(Mechanical strength ) |
- |
0 |
|
Testing charges already included in 7.4 |
| 7.6(General and safety requirements) |
- |
2000 |
|
- |
| 7.7(Voltage drop) |
- |
2000 |
|
- |
| 8.1(Performance) |
- |
5000 |
|
- |
| 8.2(Performance) |
- |
0 |
|
Testing charges already included in 8.1 |
| 8.3(Performance) |
- |
0 |
|
Testing charges already included in 8.1 |
| 9.1 (a)(Marking ) |
- |
2000 |
|
- |
| 9.1 (b)(Marking ) |
- |
0 |
|
Testing charges already included in 9.1 |
| 9.1 (c)(Marking ) |
- |
0 |
|
Testing charges already included in 9.1 |
| 9.1 (d)(Marking ) |
- |
0 |
|
Testing charges already included in 9.1 |
| 9.1 (e)(Marking ) |
- |
0 |
|
Testing charges already included in 9.1 |
| 9.1 (f)(Marking ) |
- |
0 |
|
Testing charges already included in 9.1 |
| 9.5.1 , 7.3 (a)(Temperature Rise ) |
- |
5000 |
|
- |
| 9.5.1 , 7.3(Temperature Rise) |
- |
0 |
|
Testing charges already included in 9.5.1 |
| 9.5.1 , 7.3 (b)(Temperature Rise) |
- |
0 |
|
Testing charges already included in 9.5.1 |
| 9.5.2, 7.2(Leakage Current Test(as per Cl.13.2 of IS 302 (Part 1).) |
- |
2000 |
|
- |
| 9.5.3(High Voltage Test) |
- |
2000 |
|
- |
| 9.5.7, 9.5.4(Moisture Resistance ) |
- |
7000 |
|
- |
| 9.5.5(Earthing Connection) |
- |
2000 |
|
- |
| 9.5.6(Protection against electric shock (as per Cl.8 of IS 302 (Part 1)) |
- |
2000 |
|
- |
| 9.5.8, (Mechanical strength (as per Cl.21.1 of IS 302-1:2008)) |
- |
2000 |
|
- |
| 9.5.9, 7.5, Table-1(Creepage Distances and Clearances (as per Cl. 29 of IS 302-1)) |
- |
2000 |
|
- |
| 9.5.10( Electrical Endurance Test) |
- |
5000 |
|
- |
| 9.5.11.3(Environmental Tests) |
- |
10000 |
|
Testing charges for cold test and dry heat test. |
| 9.5.11.4(Environmental Tests) |
- |
5000 |
|
- |
| 9.5.12(Resistance to Abnormal Heat and to Fire) |
- |
5000 |
|
- |
| 9.5.13(Resistance to Rusting ) |
- |
3000 |
|
- |
| 9.5.14(Checking of Dimensions) |
- |
2000 |
|
- |
| 9.2(Marking ) |
- |
0 |
|
- |
| 9.5.11.2(Environmental Tests) |
- |
4000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 51 |
IS 14286 : Part 1 : Sec 1 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 1 special requirements for testing of crystalline silicon photovoltaic (Pv) modules (Second Revision) |
- |
-
|
1315000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 11.1(Visual inspection (MQT 01)) |
- |
5000 |
|
- |
| 11.2(Maximum power determination (MQT 02)) |
- |
10000 |
|
- |
| 11.3(Insulation test (MQT 03)) |
- |
5000 |
|
- |
| 11.4(Measurement of temperature coefficients (MQT 04)) |
- |
60000 |
|
- |
| 11.5(Measurement of nominal module operating temperature (NMOT)
(MQT 05)) |
- |
20000 |
|
- |
| 11.6(Performance at STC and NMOT
(MQT 06)) |
- |
80000 |
|
- |
| 11.7(Performance at low irradiance
(MQT 07)) |
- |
30000 |
|
- |
| 11.8(Outdoor exposure test (MQT 08)) |
- |
30000 |
|
- |
| 11.9(Hot-spot endurance test (MQT 09)) |
- |
200000 |
|
- |
| 11.1(UV preconditioning test
(MQT 10)) |
- |
100000 |
|
- |
| 11.11(Thermal cycling test (MQT 11)) |
- |
250000 |
|
- |
| 11.12(Humidity-freeze test (MQT 12)) |
- |
100000 |
|
- |
| 11.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
| 11.14(Robustness of terminations
(MQT 14)) |
- |
10000 |
|
- |
| 11.15(Wet leakage current test (MQT 15)) |
- |
5000 |
|
- |
| 11.16(Static mechanical load test
(MQT 16)) |
- |
20000 |
|
- |
| 11.17(Hail test (MQT 17)) |
- |
10000 |
|
- |
| 11.18(Bypass diode thermal test (MQT 18)) |
- |
80000 |
|
- |
| 11.19(Stabilization (MQT 19)) |
- |
150000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 52 |
IS 14286 : Part 1 : Sec 2 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 2 special requirements for testing of thin - Film cadmium telluride (CdTe) based photovoltaic (Pv) modules (Second Revision) |
- |
-
|
1465000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5
IS 14286( Marking and Documentation) |
- |
0 |
|
- |
| 11.1
IS 14286( Visual inspection) |
- |
5000 |
|
- |
| 11.2
IS 14286( Maximum power determination) |
- |
10000 |
|
- |
| 11.3
IS 14286( Insulation Test) |
- |
5000 |
|
- |
| 11.4
IS 14286( Measurement of temperature coefficients) |
- |
60000 |
|
- |
| 11.5
IS 14286( Measurement of nominal module operating temperature (NMOT)) |
- |
20000 |
|
- |
| 11.6
IS 14286( Performance at STC and NMOT) |
- |
80000 |
|
- |
| 11.7
IS 14286( Performance at low irradiance) |
- |
30000 |
|
- |
| 11.8
IS 14286( Outdoor exposure Test) |
- |
30000 |
|
- |
| 11.9
IS 14286( Hot-spot endurance test) |
- |
200000 |
|
- |
| 11.10
IS 14286( UV Preconditioning test ) |
- |
100000 |
|
- |
| 11.11
IS 14286( Thermal cycling test) |
- |
250000 |
|
- |
| 11.12
IS 14286( Humidity-freeze test) |
- |
100000 |
|
- |
| 11.13
IS 14286(Damp heat test) |
- |
150000 |
|
- |
| 11.14, Table 1
IS 14286( Robutness of terminations test - Retention of Junction Box on Mounting Surface - Test of Cord Anchorage) |
- |
10000 |
|
- |
| 11.15
IS 14286( Wet leakage current test) |
- |
5000 |
|
- |
| 11.16
IS 14286( Static Mechanical load test) |
- |
20000 |
|
- |
| 11.17, Table 3 & 4,
IS 14286( Hail test) |
- |
10000 |
|
- |
| 11.18
IS 14286( Bypass diode testing) |
- |
80000 |
|
- |
| 11.19
IS 14286( Stabilization ) |
- |
300000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 53 |
IS 14286 : Part 1 : Sec 3 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 3 special requirements for testing of thin - Film amorphous silicon based photovoltaic (Pv) modules (Second Revision) |
- |
-
|
1465000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5
IS 14286( Marking and Documentation) |
- |
0 |
|
- |
| 11.1
IS 14286( Visual inspection) |
- |
5000 |
|
- |
| 11.2
IS 14286( Maximum power determination) |
- |
10000 |
|
- |
| 11.3
IS 14286( Insulation Test) |
- |
5000 |
|
- |
| 11.4
IS 14286( Measurement of temperature coefficients) |
- |
60000 |
|
- |
| 11.5
IS 14286( Measurement of nominal module operating temperature (NMOT)) |
- |
20000 |
|
- |
| 11.6
IS 14286( Performance at STC and NMOT) |
- |
80000 |
|
- |
| 11.7
IS 14286( Performance at low irradiance) |
- |
30000 |
|
- |
| 11.8
IS 14286( Outdoor exposure Test) |
- |
30000 |
|
- |
| 11.9
IS 14286( Hot-spot endurance test) |
- |
200000 |
|
- |
| 11.10
IS 14286( UV Preconditioning test ) |
- |
100000 |
|
- |
| 11.11
IS 14286( Thermal cycling test) |
- |
250000 |
|
- |
| 11.12
IS 14286( Humidity-freeze test) |
- |
100000 |
|
- |
| 11.13
IS 14286(Damp heat test) |
- |
150000 |
|
- |
| 11.14, Table 1
IS 14286( Robutness of terminations test - Retention of Junction Box on Mounting Surface - Test of Cord Anchorage) |
- |
10000 |
|
- |
| 11.15
IS 14286( Wet leakage current test) |
- |
5000 |
|
- |
| 11.16
IS 14286( Static Mechanical load test) |
- |
20000 |
|
- |
| 11.17, Table 3 & 4,
IS 14286( Hail test) |
- |
10000 |
|
- |
| 11.18
IS 14286( Bypass diode testing) |
- |
80000 |
|
- |
| 11.19(Stabilization (MQT 19)) |
- |
300000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 54 |
IS 14286 : Part 1 : Sec 4 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 4 special requirements for testing of thin - Film Cu(In,ga)(S,se)2 based photovoltaic (Pv) modules (Second Revision) |
- |
-
|
1465000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 11.3(Insulation test (MQT 03)) |
- |
5000 |
|
- |
| 11.4(Measurement of temperature coefficients (MQT 04)) |
- |
60000 |
|
- |
| 11.5(Measurement of nominal module operating temperature (NMOT)
(MQT 05)) |
- |
20000 |
|
- |
| 11.6(Performance at STC and NMOT
(MQT 06)) |
- |
80000 |
|
- |
| 11.7(Performance at low irradiance
(MQT 07)) |
- |
30000 |
|
- |
| 11.8(Outdoor exposure test (MQT 08)) |
- |
30000 |
|
- |
| 11.9(Hot-spot endurance test (MQT 09)) |
- |
200000 |
|
- |
| 11.1(UV preconditioning test
(MQT 10)) |
- |
100000 |
|
- |
| 11.11(Thermal cycling test (MQT 11)) |
- |
250000 |
|
- |
| 11.12(Humidity-freeze test (MQT 12)) |
- |
100000 |
|
- |
| 11.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
| 11.14(Robustness of terminations
(MQT 14)) |
- |
10000 |
|
- |
| 11.15(Wet leakage current test (MQT 15)) |
- |
5000 |
|
- |
| 11.16(Static mechanical load test
(MQT 16)) |
- |
20000 |
|
- |
| 11.17(Hail test (MQT 17)) |
- |
10000 |
|
- |
| 11.18(Bypass diode thermal test (MQT 18)) |
- |
80000 |
|
- |
| 11.19(Stabilization (MQT 19)) |
- |
300000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 55 |
IS 16169 (2019) |
Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures (First Revision) |
- |
-
|
100000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6(Test for single or multi-phase inverter) |
- |
100000 |
|
Testing Charges mentioned are for Upto 20kW.
For >20kW to 50kW =Rs.150000
For >50kW to 100kW =Rs.200000
For >100kW to 200kW =Rs.300000 |
| Annex A(Islanding as it applies to PV systems) |
- |
0 |
|
- |
| Annex B(Test for independent islanding device) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 56 |
IS 1474 (1959) |
Specification for commercial refrigerators |
- |
-
|
350000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7.5.1(Pressure Test) |
- |
10000 |
|
- |
| 7.5.3(Insulation Resistance Test (Assembly Test)) |
- |
5000 |
|
- |
| 7.5.4(Thermal Insulation Test) |
- |
25000 |
|
- |
| 7.5.5(Condensation Test) |
- |
50000 |
|
- |
| 7.5.6(Rating Test) |
- |
140000 |
|
- |
| 7.5.7(Test for Adequate Rating of Compressor Motor) |
- |
80000 |
|
- |
| 7.5.8(Door Seal Test) |
- |
5000 |
|
- |
| 3.3.1(Gross Volume) |
- |
5000 |
|
Testing charges are for Cl. 3 |
| 3.3(Volume of evaporator space) |
- |
0 |
|
Testing charges are mentioned in cl. 3.3.1 |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 57 |
IS 2312 (1967) |
Specification for propeller type AC ventilating fans (First Revision) |
- |
-
|
40000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.1(Sizes ) |
- |
1000 |
|
Testing charges are for Cl. no.3 |
| 4.1(Rated Voltage) |
- |
0 |
|
- |
| 5.1(Rated frequency) |
- |
0 |
|
- |
| 6.1(Design and General Construction) |
- |
2000 |
|
Testing charges are for Cl. no.6 |
| 6.3(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.3(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.4(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.5(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.6(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.7(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.9(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.1(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.11(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 6.12(Design and General Construction) |
- |
0 |
|
Testing charges are for Cl. no.6.1 |
| 7.1(Design and General Construction) |
- |
0 |
|
- |
| 8.1(Design and General Construction) |
- |
0 |
|
- |
| 9(Design and General Construction) |
- |
0 |
|
- |
| 10.1(Starting ) |
- |
3000 |
|
Testing charges are for Cl. no.10 |
| 11.1(Interchangeability) |
- |
2000 |
|
Testing charges are for Cl. no.11 |
| 13.1(Marking) |
- |
0 |
|
- |
| 13.1 (a)(Marking) |
- |
0 |
|
- |
| 13.1 (b)(Marking) |
- |
0 |
|
- |
| 13.1 (c)(Marking) |
- |
0 |
|
- |
| 13.1 (d)(Marking) |
- |
0 |
|
- |
| 13.1 (e)(Marking) |
- |
0 |
|
- |
| 13.1 (f)(Marking) |
- |
0 |
|
- |
| 13.1 (g)(Marking) |
- |
0 |
|
- |
| 13.1 (h)(Marking) |
- |
0 |
|
- |
| 13.1 (j)(Marking) |
- |
0 |
|
- |
| 13.2(Marking) |
- |
0 |
|
- |
| 13.4(Marking) |
- |
0 |
|
- |
| 14.2 & 15.1(Air Delivery) |
- |
6000 |
|
Testing charges are for Cl. no.14.2 |
| 14.3.A(Temperature-Rise (for motors)) |
- |
3000 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.A(Temperature-Rise (for motors)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.A(Temperature-Rise (for motors)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.A(Temperature-Rise (for motors)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.B(Temperature-Rise (for regulators)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.B(Temperature-Rise (for regulators)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.B(Moistureproofness (for regulators only)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.3.B(Moistureproofness (for regulators only)) |
- |
0 |
|
Testing charges are for Cl. no.14.3 |
| 14.5(Mechanical Endurance (for regulators only)) |
- |
0 |
|
- |
| 14.1 & 14.6(Power factor) |
- |
2000 |
|
Testing charges are for Cl. no.14.6 |
| 14.7(ac leakage) |
- |
1000 |
|
- |
| 14.8(High voltage test) |
- |
1000 |
|
- |
| 14.9(Insulation-Resistance) |
- |
3000 |
|
- |
| 14.1(Earthing continuity) |
- |
2000 |
|
- |
| 14.11 & 15.1(Electrical Input) |
- |
3000 |
|
Testing charges are for Cl. no.14.11 |
| 14.12 & 16(Fan Speed) |
- |
4000 |
|
Testing charges are for Cl. no.14.12 |
| 14.4(Moistureproofness (for regulators only)) |
- |
5000 |
|
- |
| 14.4(Moistureproofness (for regulators only)) |
- |
0 |
|
Testing charges are for Cl. no.14.4 |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 58 |
IS 1534 : Part 1 (1977) |
Ballasts for fluorescent lamps:Part 1 For switch start circuits |
- |
-
|
72000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 9.13(Performance) |
- |
10000 |
|
- |
| 9.12(Resistance To Corrosion) |
- |
1000 |
|
- |
| 9.11(Resistance To Heat) |
- |
3000 |
|
- |
| 9.1(Test for Mechanical Strength) |
- |
2000 |
|
- |
| 9.9(Test For Limitations Of Ballast Heating) |
- |
5000 |
|
- |
| 9.8(Test for Thermal Endurance Of Windings) |
- |
30000 |
|
- |
| 9.7(Moisture Resistance and Insulation) |
- |
2000 |
|
- |
| 9.6(Voltage Across Capacitors) |
- |
1000 |
|
- |
| 9.5(Protection against Accidental Contacts and Electric Shock) |
- |
2000 |
|
- |
| 9.4(Visual Examination) |
- |
1000 |
|
- |
| 8(Marking) |
- |
2000 |
|
- |
| 7(Creepage Distances and Clearances) |
- |
2000 |
|
- |
| 6(Provision For Earthing) |
- |
2000 |
|
- |
| 5(Screws, Current-Carrying Parts And Connections) |
- |
1000 |
|
- |
| 4(Terminals For External Wiring) |
- |
3000 |
|
- |
| 3(General Design, Construction and workmanship) |
- |
2000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |
| 59 |
IS 4283 (1981) |
Withdrawal |
- |
-
|
- View breakup
Rs. 47,000/- upto 3 kW
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
Complete
|
|
20 Jun, 2022 |
- - |
| 60 |
IS 366 (1991) |
Electric iron - Specification (Fourth Revision) |
- |
-
|
74000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 10.0(Measurement of Heating up time) |
- |
3000 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
3000 |
|
- |
| 12.0(Measurement of Tempearture Distribution) |
- |
3000 |
|
- |
| 13.0(Measurement of Initial overswing temperature and Heating up excess temperature) |
- |
3000 |
|
- |
| 14.0(Measurement of Cyclic fluctuation of temperature of hottest point ) |
- |
3000 |
|
0 |
| 16.0(Measurement of Thermostatic staibility) |
- |
4000 |
|
- |
| 17(Finish) |
- |
1000 |
|
- |
|
Complete
|
|
20 Jun, 2022 |
- - |